
Programming an ORION CE Gas Endpoint
NOT: N Before beginning, make sure the IR programming cable is connected and the IR COM port is set correctly. Refer to
"Settings for Program & Quick Read" onpage86 for additional information.
Programming an ORION CE gas endpoint is performed on the ORION CE IR screen. The steps below are specific for gas
endpoint programming. For additional information about the screen, refer to "ORION CE IR Programming" onpage74.
1. From the ORION CE main menu, tap ORION CE IR Programming.
Result: The ORION CE IR screen is displayed.
2. Align the read head of the IR cable to the gas endpoint. Then tap Read.
Result: The Gas Drive Circle screen is displayed automatically.
Figure 143: ORION CE IR programming screen
Figure 144: Gas Drive Circle screen
3. To change the pressure factor, tap in the Pressure
eld. Use the keypad to enter the pressure factor.
Result: The pressure you entered is displayed on the Gas
Drive Circle screen.
Figure 145: Gas pressure factor
Installation & Operation Manual
Page 81 February 2013
Kommentare zu diesen Handbüchern