Check the "Listen for Gateway" box on the Step 2 screen for fixed network applications.
Align the optical head of the IR cable with the endpoint IR port and tap IR START.
Step 3 When Step 3 displays, place the endpoint into position.
For example, if the endpoint is a pit lid install, place it into position under the pit lid.
Tap RF GO.
Result: A message displays while the endpoint attempts to make radio contact with any gateway(s).
The gateway serial numbers are listed for the gateways from which the endpoints have received
acknowledgement as shown in Figure 122.
Tap Finish.
Figure 121: Place endpoint into location
Figure 122: Gateway response
Step 4 The Installation Complete screen displays.
Tap Ok to return to the first Installation screen.
Figure 123: Installation complete
ORION® Automated Meter Reading System for Trimble® Ranger 3
Page 70 February 2013